The Lecture Notes Blog

Home » An Introduction to Operations Management » Labor content, cycle time and idle time

Labor content, cycle time and idle time


Cycle time, labor content and idle time are indicators for assessing the productivity of a process.

Cycle time: The cycle time is defined as the time between the output of two successive flow units (e.g. the time between two served customers or two treated patients). It is always equivalent to the time of the longest process step.

Total labor content: The total labor content is defined as the time sum of all process steps. If, for example, a process consists of two steps each claiming 20 seconds, the total labor content is 40 seconds.

Idle time: The idle time is defined as cycle time minus processing time. The idle time thus tells us for how long a resource (e.g. a worker) is not able to do anything, because he has to wait for another resource. If, for example, one worker in a sandwich restaurant prepares sandwiches while another operates the register, the second worker has to wait for a sandwich to be finished in order to collect on the customer. If the demand is maxed out, the idle time at the bottleneck is always 0.

Total idle time: The total idle time is the time sum of all idle time within a process.

These lecture notes were taken during 2013 installment of the MOOC “An Introduction to Operations Management” taught by Prof. Dr. Christian Terwiesch of the Wharton Business School of the University of Pennsylvania at Coursera.org.
Advertisements

6 Comments

  1. […] labor utilization: The average labor utilization is defined as the total labor content divided by the sum of labor content and total idle time. If, for example, the total labor content […]

  2. […] the first week, the concept of idle time was introduced. In general, idle time is the time during which a resource is not fully used because […]

  3. […] that is available on a certain resource is added up. During the following step, the waste times (idle time, time spent on failures, maintenance time etc.) are identified and also added. By subtracting the […]

  4. […] the takt time has been determined, the target manpower can be calculated as the ratio of total labor content (the time sum of all worksteps needed to produce one flow unit) and takt time. The target manpower […]

  5. […] common mistake in process optimisation is to just look at average processing times as well as at idle times. Instead, it is also important to evaluate the time differences between employees in order to find […]

  6. […] rate is not effected by demand pooling, the waiting time is shortened because some inefficiencies (idle time at station A while station B is overwhelmed) are eradicated. However, pooling more and more […]

Leave a comment:

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: